first saturday a.i.r. day. artists in residence are required to put in 1 work day per week and my day is now saturday. everyday is different, depending on the flow of the week. i thought i had a pretty busy day before (tuesday) but today was rough! after cleaning toliets, dumping overflowing garbage, setting up a classroom area and loading two kilns we tore down a clay pit/structure?? made from cinder blocks and full of peter king clay. here’s a “sculpture” i built with the blocks and the pile next to it is the clay we hauled over. everything was heavy. jr, the regular saturday guy was leaving me in the dust when it came to to shoveling clay but whatever, we got everything done and cleared up.

cinder block pyramid